Costa Coffee
Costa Coffee (Maintenance) - Larnaca Mall
What we did
For this Costa Coffee Cyprus maintenance project, MAKE IT ALL carried out repair works to a damaged plasterboard ceiling caused by an air-conditioning drain leak. Due to the height of the ceiling, approximately 6 metres, we arranged and used a scissor lift to safely access the affected area.
Our team carefully cut out and removed the damaged plasterboard section, replaced it with new plasterboard, and completed the necessary plastering works. Once the surface was prepared, we repainted the repaired area to match the existing ceiling finish, leaving the space clean, safe, and professionally restored.
The project was completed successfully, with the customer happy with the final result.